Four boys and ten girls can cut a field first in 5 hours. If the boys work at \(\frac{5}{4}\) the rate at which the girls work, how many boys will be needed to cut the field in 3 hours? 

A.

180

B.

60

C.

25

D.

20

Correct answer is D

Let x rep. numbers of boys that can work at \(\frac{5}{4}\) the rate at

 which the 10 girls work 

For 1 hrs, x boys will work for \(\frac{\frac{1}{5} \times 10}{4}\) 

x = \(\frac{5}{4}\) x 10 

= 8 boys 

8 boys will do the work of ten girls at the same rate 

4 + 8 = 12 bous cut the field in 5 hrs for 3 hrs, 

\(\frac{12 \times 5}{3}\) boys will be needed = 20 boys.